Occupied buildings
Demo inside an occupied multi-tenant property has protection, noise, and dust requirements. Off-hours work and negative-air containment are typical.
Commercial demolition in Austin
Bailey & Bear Construction is an Austin commercial demolition contractor for selective interior demolition, tear-out prep for buildouts, and full commercial demolition across Austin. Every scope is permitted where required, phased around occupied spaces, and coordinated with abatement and haul-off. Full commercial GC with licensed demo crews.
Bailey & Bear runs commercial demolition as the first phase of buildouts and as standalone strip-out projects across the Austin metro. Common scope includes selective interior demo — walls, ceilings, flooring, fixtures, casework — down to the shell or to a specific baseline, slab cutting and patching for plumbing and electrical rough-in, exterior storefront demo and shoring, mechanical and plumbing demo with cap-off, roof demo for equipment change, hazardous materials coordination when asbestos or lead is present, disposal and recycling coordination with Austin waste haulers, and site protection so the surrounding tenants and public spaces stay safe.
Demo inside an occupied multi-tenant property has protection, noise, and dust requirements. Off-hours work and negative-air containment are typical.
Pre-1980 buildings can carry asbestos in flooring, insulation, and mastics. Testing before demo is cheaper than a shutdown mid-project.
Removing a bearing wall, cutting a slab, or opening a storefront requires stamped drawings and shoring. Not a demo-crew judgment call.
Interior demo runs under the buildout permit through Austin Development Services. Structural changes need engineered drawings. Asbestos removal is regulated by the Texas Department of State Health Services and requires a licensed abatement contractor and pre-demolition notification for many projects. Lead-based paint work has its own EPA-mandated requirements on older buildings. Bailey & Bear coordinates the abatement contractor and the notification path on projects where hazardous materials are present, and we do not proceed with demo until testing has cleared or abatement has finished.
Adjacent walls, floors, ceilings, storefronts — what you protect is what you save. Cheap demo bids skip protection and hand a change order to the next trade.
Mechanical, electrical, and plumbing have to be capped and tagged safely before demo. This is a coordination line item, not a demo line item.
Metal, concrete, and drywall have separate disposal paths in the Austin metro. Recycling credits can offset disposal costs on larger projects.
Confirm what is being demoed and to what baseline — shell condition or a partial baseline. Confirm hazardous materials testing has been done, and if not, who is paying for it and who owns the schedule risk. Confirm protection scope — adjacent tenants, storefronts, floors, ceilings. Confirm cap-off coordination with the MEP subs. Ask about hauling and disposal — who owns the dumpsters, who owns the recycling credits. Ask for two Austin commercial demo references in an occupied-building context — that is where demo craft shows.
Bailey & Bear runs this trade inside larger buildouts across Austin. Common vertical combinations:
Conference rooms, HVAC zoning, cabling
Storefronts, lighting, fitting rooms, POS
Hood, grease, health, kitchen equipment
Industrial shells, dock, epoxy, sprinkler mod
Exam, treatment, imaging, ADA
Stations, exhaust, TDLR compliance
Yes. Bailey & Bear does selective interior demolition as prep for Austin commercial buildouts — walls, ceilings, flooring, MEP, and fixtures. Selective demo is the least glamorous phase but the one that most often runs late; we scope it against real conditions, not the drawings.
Yes. Bailey & Bear phases commercial demolition on occupied Austin buildings around operations — after hours, weekends, containment barriers, and access windows are planned up front.
Bailey & Bear coordinates asbestos and lead abatement on Austin commercial demolition through licensed abatement contractors. Testing and abatement precede demolition on any pre-1980 building — that's a legal requirement, not an option.