Call 512.689.8346

Emergency demolition ยท Austin TX

Emergency demolition for dangerous buildings in Austin

When a fire, storm or City order leaves a building unsafe, you need a demolition contractor in Austin who can plan the teardown properly. Bailey & Bear does that work with its own crew, not a subcontractor. Call or text the address and what happened; we walk the site and write the scope first.

Mon-Sat 8 AM-6 PM. If anyone is in danger right now, call 911 and keep people away from the structure.

What to send us

  • Address or cross street
  • Photos of the building, taken from a safe distance
  • Any City notice or order number
  • Whether utilities are off

What “emergency” means on this page

Emergency describes the building, not our hours. This page is for Austin property owners with a building that fire, a storm or a collapse has left unsafe, or that the City has ordered demolished, and that needs to come down rather than be repaired. We do not promise a start date before we have walked the site. Every job starts with a walkthrough and a scope-first written estimate.

Not this page: for planned strip-out and buildout demo see commercial demolition; for repairs after an insurance claim see insurance restoration; for rebuilding after a leak or flood see water damage rebuild.

What we handle on a damaged building

Whole-building teardown

We take down whole buildings with our own crew, plus roof demo, exterior storefront demo and slab cutting where the scope calls for it.

Utilities, abatement and permits

MEP cap-off before work starts, asbestos survey and any abatement coordinated with a separate abatement firm, and permits where required.

Partial demo and haul-off

When part of the building stays, structural changes need engineered drawings and shoring. Debris haul-off is coordinated with the demo.

The City of Austin's proposed emergency demolition process

This is a proposal, not law. A draft ordinance would add Chapter 12, Emergency Demolition, to Austin's local amendments to the 2024 International Property Maintenance Code (City Code Chapter 25-12, Article 9). On November 5, 2026, City Council approved, on consent, setting a public hearing for November 19, 2026. The November 19 draft agenda lists it as a hearing to receive public comment on a possible future code amendment, so Council has not voted on the ordinance itself. We will update this page when Council acts.

If adopted, the building official could order demolition of a structure that is an imminent threat to life and safety. Demolition would start no later than 96 hours after the building official, the fire code official (if applicable) and the director sign the affidavit and order. It would not apply to occupied structures, and it includes placarding and internal review first.

A City-ordered demolition is the City's process. An owner who acts first hires their own contractor and keeps control of the scope, salvage and the rebuild. This is general information, not legal advice. Confirm your property's status with Austin Development Services at 512-978-4000.

Sources: draft ordinance (City of Austin), November 5, 2026 Council agenda, item 25, November 5, 2026 Council action notes, City staff summary of the proposed Chapter 12.

The process that is already in force: Building and Standards Commission orders

Until City Council adopts an emergency demolition ordinance, a dangerous or substandard building in Austin usually follows the City's standard process. Austin Development Services (code compliance) can investigate a dangerous or fire-damaged structure. Dangerous structures must be made safe or demolished; fire-damaged buildings must be repaired or demolished to meet code. If the case goes further, the Building and Standards Commission hears it. The Commission typically meets on the fourth Wednesday of the month and can order a structure repaired, vacated, or demolished.

That path is the one in use today. A Development Services memo describes it as a monthly Commission process that can take months. Some recent Commission demolition orders have given the owner 45 days to complete the work and, if the owner does not comply, have authorized the Code Official to proceed on the 46th day. Other cases have used different timeframes, including 90-day repair windows. The deadline in a specific order is the one that applies; 45 days is not a fixed rule.

If you have a repair-or-demolish order and you want your own contractor to do the work, Bailey & Bear can walk the site, write a scope-first estimate, and coordinate permits where required, utility cap-off, an asbestos survey, and any abatement with a separate abatement firm. Our own crew does the demolition, not a sub. We answer calls and texts Mon-Sat 8 AM-6 PM and do not promise a start date before we have walked the site.

This is general information, not legal advice. Confirm your property's status and deadlines with Austin Development Services at 512-978-4000, or Code Connect at 512-974-2633.

Sources: Building and Standards Commission, Dangerous/Fire-Damaged Structures (Austin Development Services), Development Services staff memo (October 30, 2026), example Commission demolition order (April 22, 2026).

How it works

  1. Call or text 512-689-8346 with the address and what happened.
  2. We walk the site, from a safe distance where the structure is unsafe.
  3. You get a scope-first written estimate: what comes down, what stays, salvage, utilities, abatement and haul-off.
  4. Abatement testing, utility cap-off and permits where required come before the teardown.
  5. Teardown and haul-off, then the site is left ready for your rebuild plans.

What to have ready for the first call

The property address, what happened (fire, storm, collapse, or a City demolition order), photos taken from a safe distance, whether the City has placarded the building, whether utilities are off, and your insurance adjuster's contact if a claim is open.

Where we take emergency and dangerous-building jobs

We serve Austin and about 30 miles around. When the address is in that range, that includes Round Rock, Pflugerville, Cedar Park, Georgetown, Leander, Manor, Bastrop, Kyle, Buda and Dripping Springs. Call or text the address and we will tell you if it is in our area.

Permits, utilities and neighbor notice for an Austin demolition

An Austin demolition permit is required for a total demolition, and for a partial demolition that removes more than half of the exterior walls. The City requires a pre-demolition inspection for those jobs, and an Affidavit of Compliance with the application.

Before the pre-construction inspection, request disconnect and removal of Austin Energy and Austin Water service by calling the City of Austin Utility Contact Center at 512-494-9400.

Five to 10 business days before demolition, the general contractor must place a yard sign and door hangers to notify adjacent residential properties.

Residential structures 45 years or older require review by the Historic Preservation Office, and possibly the Historic Landmark Commission.

Commercial demolitions require an Asbestos Compliance Notification Form. A single private residence, or a single apartment building with no more than four dwelling units, is excluded from that form. Bailey & Bear does not remove asbestos; when abatement is needed, a separate abatement firm does it.

Austin's Construction and Demolition Recycling Ordinance applies to commercial and multifamily demolition projects of all sizes. The general contractor must divert at least 50% of the project debris from the landfill, or landfill less than 2.5 pounds of debris per square foot of floor area, and submit a recycling report.

This is general information, not legal advice. Confirm the requirements for your property with Austin Development Services at 512-978-4000. Sources: City of Austin demolition permit, Construction and Demolition Recycling Ordinance.

Fire-damaged house and building demolition in Austin

Fire damage demolition is often needed when part of the building cannot be saved: burned framing, a roof that has fallen in, and debris soaked by smoke and the water used to put the fire out. Our own crew takes down what has to go and hauls it off. If part of the house may be saved, we can look at a partial teardown and mark where the cut line would be.

If an insurance claim is open, you can share your adjuster's contact with us. In general, a written demolition scope that spells out what comes down, what stays, utility work and haul-off can make it easier to compare against the claim. Your adjuster and your policy decide what is covered. For the repair and rebuild side, see insurance restoration.

Please do not go inside a fire-damaged building to take photos. Pictures from the street or the yard are enough for a first look. Text them with the address to 512-689-8346.

What sets the cost of an emergency teardown

We do not quote a price before we walk the site, because a damaged building can hide conditions that affect the cost. Every site is different, but these are common factors in demolition cost:

  • Size of the building and the number of stories.
  • How it is built: wood frame, brick or block, and whether the slab or pier-and-beam foundation comes out too.
  • How much debris there is, and how much of it is burned or wet.
  • What the asbestos survey finds, and whether a separate abatement firm has to remove anything first.
  • Utility disconnects and any permits that apply to the property.
  • Access for equipment: alley or street, trees, fences, and how close the neighbors are.
  • Whether the whole building comes down or only the damaged part.

To start, call or text 512-689-8346 with the address, what happened and a few photos taken from a safe distance. We answer Mon-Sat 8 AM-6 PM and will tell you what we need to see before we write a scope-first estimate.

Frequently asked questions

Can Bailey & Bear tear down a fire-, storm- or collapse-damaged building in Austin?

Yes. Bailey & Bear tears down whole buildings with its own crew, not through a subcontractor. We walk the site, write a scope-first estimate, and coordinate permits where required, asbestos survey and any abatement coordinated with a separate abatement firm, utility cap-off and haul-off. Call or text 512-689-8346, Mon-Sat 8 AM-6 PM.

Does emergency demolition mean you work around the clock?

No. Here, emergency describes the condition of the building, not our hours. We answer calls and texts Mon-Sat 8 AM-6 PM, and we do not promise a start date before we have walked the site. If anyone is in danger right now, call 911 and keep people away from the structure.

Has the City of Austin adopted an emergency demolition ordinance?

Not yet. It is a proposed ordinance. On November 5, 2026, City Council set a public hearing for November 19, 2026, to receive public comment; it has not voted on the ordinance itself. The draft would add Chapter 12, Emergency Demolition, to the local amendments to the 2024 International Property Maintenance Code in City Code Chapter 25-12, Article 9.

What would the proposed City process do?

If adopted, the building official could order demolition of a structure that is an imminent threat to life and safety. Demolition would start no later than 96 hours after the building official, the fire code official (if applicable) and the director sign the affidavit and order. The proposal does not apply to occupied structures, and it includes placarding and internal review first.

Why would an owner hire their own contractor instead of waiting for the City?

A City-ordered demolition is the City's process. An owner who acts first hires their own contractor and keeps control of the scope, what is salvaged and how the site is left for the rebuild. This is general information, not legal advice. Confirm your property's status with Austin Development Services at 512-978-4000.

What is Austin's Building and Standards Commission demolition process?

The Building and Standards Commission hears cases about dangerous or substandard buildings under City and state housing rules. It typically meets on the fourth Wednesday of the month and can order a structure repaired, vacated, or demolished. Development Services staff have said that when a demolition order goes through this process, it can take months. Confirm your case with Austin Development Services at 512-978-4000.

I received a City demolition order. Can Bailey & Bear do the work?

Yes, if you are hiring your own contractor to meet the order. Bailey & Bear tears down whole buildings with its own crew, not through a subcontractor. We walk the site, write a scope-first estimate, and coordinate permits where required, utility cap-off, an asbestos survey, and any abatement with a separate abatement firm. We do not promise a start date before we have walked the site. Call or text 512-689-8346, Mon-Sat 8 AM-6 PM. This is not legal advice; confirm your deadline with the City.

Does every demolition order give the owner 45 days?

No. Some recent Commission orders have used a 45-day demolition deadline and authorized the Code Official to proceed on the 46th day if the owner does not comply. Other cases have used different timeframes, including longer repair windows. The deadline written in your order is the one that applies.

How is a Commission order different from the proposed emergency demolition process?

A Building and Standards Commission order is the process in use today. The proposed emergency process would let the building official order demolition of a structure that is an imminent threat, with demolition starting no later than 96 hours after the required signatures. City Council has not adopted that ordinance. On November 5, 2026, Council set a public hearing for November 19, 2026, to receive public comment; it has not voted on the ordinance itself.

What about asbestos in a damaged building?

Texas requires an asbestos survey before demolition of public and commercial buildings, and the Texas Department of State Health Services (DSHS) must be notified at least 10 working days before the demolition, even if no asbestos is found. Emergency and government-ordered demolitions have different notice timing. A single private residence is not subject to the federal asbestos notification rule. Bailey & Bear does not remove asbestos; when abatement is needed, a separate abatement firm does it, and we coordinate the schedule around it.

Can you take down only the damaged part and keep the rest?

Sometimes. Removing part of a building while the rest stays is a structural change, and structural changes need engineered drawings and shoring. We scope it after the walkthrough and do not start structural work until the engineered drawings are in hand.

How is this different from your commercial demolition page?

Our commercial demolition page covers planned work such as selective interior demo, tenant strip-out and buildout demo. This page is for a damaged or dangerous building that needs to come down. Insurance restoration and water damage rebuild pages cover the repair and rebuild side.

What areas do you serve for demolition of damaged buildings?

Austin and about 30 miles around. Call or text the address and we will tell you if it is in our area.

Damaged building that needs to come down?

Mon-Sat 8 AM-6 PM. Serving Austin and about 30 miles around.

You can also send the project form.