Infection Control (ICRA) Renovation in Occupied Healthcare Buildings in Austin

Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.

Serving Austin and Central TexasWalkthrough → written scope → line-item estimateSee finished projects

Renovation work next to patient areas that stay open: containment barriers, negative air, clean and dirty routes, and cleanup steps built to the infection control plan the facility sets.

How we renovate inside occupied healthcare buildings

Bailey & Bear Construction renovates spaces inside occupied clinics, medical office buildings and outpatient facilities in Austin and nearby cities. We build to the facility's infection control risk assessment (ICRA): containment barriers, negative air where required, sealed openings, clean and dirty routes, daily cleanup, and inspection before each containment comes down.

Call or text 512-689-8346 to schedule a walkthrough.

Infection control measures we build

Containment barriers

Floor-to-deck barriers with sealed joints and penetrations, built to the class of work in the facility's ICRA and kept intact for the full phase.

Anterooms and entries

Anterooms with walk-off mats at the containment entry, so workers and materials pass through a controlled space before reaching the work area.

Negative air

Negative air machines with filtered exhaust where the ICRA calls for them, with pressure checked and recorded the way the facility requires.

Sealed openings

Return air, diffusers, ceiling openings and penetrations inside the work area sealed so dust does not travel through the building.

Clean and dirty routes

Debris moved in covered carts on agreed routes and times, separate from patient and staff paths.

Cleanup and release

Daily cleanup inside containment and a final clean before the facility's infection prevention team walks the area and releases it.

Working to the facility's ICRA

The infection control risk assessment belongs to the facility. It pairs the type of construction activity with the patient risk group in and around the work area and sets the class of precautions. We price and build to the class the facility assigns, and we walk the area with the infection prevention and facility teams before pricing so the barrier layout, entry points and routes are agreed.

If the ICRA changes during the project, for example because a neighboring room changes use, we adjust the containment and record the change in writing before work continues.

Renovation work we do in healthcare buildings

Phasing and scheduling around patients

Noisy work, shutoffs and tie-ins are planned with the facility team and moved to evenings, weekends or clinic closures when patient areas next to the work are busy. Utility shutoffs are requested in writing ahead of time, in the format the facility uses, and confirmed before they happen.

How this differs from a new build-out

A build-out in an empty shell carries little infection control risk. The work on this page is renovation inside, above or beside space where patients are being seen, where containment and cleanup drive the plan. For build-outs in vacant space, see our healthcare build-out page linked below.

Direct for the facility or through your general contractor

Facility and practice teams can bring us in directly for renovation work. When a project is let through a general contractor, we price the interior renovation and containment scope as a subcontractor from the GC's RFQ package, follow the GC's ICRA plan and route questions through the GC.

Questions we settle at the walkthrough

The answers go into the written scope, so containment is priced as part of the work, not added later.

Other healthcare spaces we bid: dental office build out, dialysis and outpatient clinic build-outs, physical therapy clinic build out and Austin commercial buildout contractor.

Above-ceiling and small-scope work

Not every job is a full room renovation. Data, sprinkler and HVAC work above occupied corridors and exam rooms still needs infection control. For short above-ceiling tasks, portable containment units or small enclosures can be used where the ICRA allows, with tile removed and replaced inside the enclosure and the area cleaned before it is opened.

Daily checks inside containment

Checks are recorded in the format the facility asks for and kept on site for review.

How to send us your RFQ

General contractors and owners: send your RFQ scope and drawings. Call or text 512-689-8346. We aim to schedule a site walkthrough. Questions on the documents go back to you before the due date, and the quote comes back line by line with inclusions, exclusions and clarifications written out.

Related work

For build-outs in vacant space, see healthcare and senior care build-outs and medical tenant build-outs in Austin and Medical buildout cost in Austin and commercial renovation in Austin.

Frequently asked questions

Do you renovate inside occupied clinics and medical office buildings?

Yes. We renovate exam rooms, corridors, waiting areas and restrooms inside occupied healthcare buildings in Austin and nearby cities, built to the facility's infection control risk assessment.

What is an ICRA and who sets it?

An infection control risk assessment pairs the type of construction work with the patient risk group nearby and sets the class of precautions. The facility sets it; we price and build to the class assigned.

What infection control measures do you build?

Floor-to-deck containment barriers, anterooms with walk-off mats, negative air where required, sealed openings, covered debris routes, daily cleanup and a final clean before the facility releases the area.

Can noisy work happen outside clinic hours?

Yes. Noisy work, shutoffs and tie-ins can be scheduled for evenings, weekends or clinic closures, requested in writing in the format the facility uses.

How do we start a healthcare renovation?

Call or text 512-689-8346 to schedule a walkthrough. Send the facility address, the rooms in scope, the ICRA class if set and any drawings. We aim to schedule a site walkthrough. Then we send a written scope.