New suspended grid
Main runners, cross tees, wall angle and hanger wires laid out to the reflected ceiling plan, at the heights on the drawings.
For general contractors, owners and property managers
Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.
Serving Austin and Central TexasWalkthrough → written scope → line-item estimateSee finished projects
Suspended acoustical ceilings in offices, schools, clinics, retail and common areas: new grid and tile, grid and tile replacement, and ceiling resets after above-ceiling work.
Bailey & Bear Construction installs and replaces suspended acoustical ceilings for general contractors, owners and property managers in Austin and nearby cities. We install grid and tile to the reflected ceiling plan, coordinate lights, diffusers, sprinkler heads and access panels with the other trades, and quote line by line from your drawings.
General contractors and owners: send your RFQ scope and drawings. Call or text 512-689-8346.
Main runners, cross tees, wall angle and hanger wires laid out to the reflected ceiling plan, at the heights on the drawings.
Lay-in and tegular tile in the products the specification calls for, cut neatly at walls, columns and penetrations.
Old or stained ceilings replaced with new grid and tile in occupied buildings, area by area.
Tile and grid reset after above-ceiling MEP, data or sprinkler work, with damaged tile replaced to match.
Drywall soffits, bulkheads and transitions where the acoustical ceiling meets hard ceilings or changes height.
Access panels, ceiling-mounted specialties and trim installed with the grid.
The ceiling is where every trade meets. Before grid goes up, we review the reflected ceiling plan against the lighting, mechanical and fire sprinkler layouts and send questions back on conflicts, so lights, diffusers, sprinkler heads, speakers and sensors land in the grid and not half on a tee.
Grid goes in after above-ceiling inspections are signed off, and tile goes in last, once overhead work is complete, so finished tile is not damaged by other trades. Plumbing, HVAC and electrical work is performed by experienced trade partners under Bailey & Bear's project coordination.


Replacing an existing ceiling in a building that stays open means working one room, suite or corridor at a time. We protect furniture and floors, remove and dispose of old tile and grid, and install the new ceiling before moving on. Work above occupied areas can move to evenings and weekends, following the building's access rules.
The answers go into the quote as inclusions and clarifications.
Some ceilings only need new tile: the grid is straight, clean and at the right height, and the owner wants a fresh look or better acoustics. Others need the grid replaced as well, because it is bent, rusted, out of level or laid out for a room that no longer exists.
We walk the space and tell you which case you have. When the grid stays, we clean or paint it if the scope calls for it and replace tile to match the specification.
Linear wood, wood-look and metal panel ceilings in lobbies, reception areas and amenity spaces, installed on the manufacturer's suspension system.
Acoustical clouds and hanging baffles in open offices, classrooms and open-to-structure spaces, hung at the heights and spacing on the drawings.
Tile suited to restrooms, kitchens and clinic areas where the specification calls for moisture resistance or a cleanable face.
Trim, edge profiles and transitions where specialty ceilings meet standard grid or drywall.
School classrooms and clinic rooms bring their own ceiling needs. In schools, ceiling work is often packed into the summer window, so tile and grid are ordered ahead and installed room by room as overhead work finishes. In occupied clinics, tile removal above patient areas follows the facility's infection control plan, with containment in place before tile comes down.
General contractors and owners: send your RFQ scope and drawings. Call or text 512-689-8346. We aim to schedule a site walkthrough. Questions on the documents go back to you before the due date, and the quote comes back line by line with inclusions, exclusions and clarifications written out.
For walls and framing, see commercial drywall in Austin. For broader interior work, see tenant improvements in Austin and commercial renovation in Austin.
Yes. We install suspended grid and acoustical tile for general contractors, owners and property managers in Austin and nearby cities, quoted line by line from your reflected ceiling plans.
Yes. We replace ceilings one room, suite or corridor at a time, protect furniture and floors, and can move work to evenings and weekends.
We review the reflected ceiling plan against the lighting, mechanical and sprinkler layouts before grid goes up, send questions on conflicts, and install tile last after overhead work is complete.
Yes. We reset grid and tile after above-ceiling MEP, data or sprinkler work, and replace damaged tile to match.
Reflected ceiling plans, the finish schedule, specifications, addenda, the bid date and any occupied-building rules. General contractors and owners: send your RFQ scope and drawings. Call or text 512-689-8346.
Call or text 512.689.8346 for a walk-through.