Call 512.689.8346

Restroom renovations ยท Austin TX

Commercial restroom renovation contractor in Austin

Send plans, the bid form and the due date — get a written line-item quote with written clarifications.

Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.

Bailey & Bear Construction renovates commercial restrooms in Austin, Round Rock, Cedar Park, Leander, Georgetown and Pflugerville for campuses, schools, office buildings and retail centers. The work is phased so the building stays open, accessibility clearances are built as drawn, and the price is one written line-item quote with clarifications in writing.

Bailey & Bear is a restroom renovation contractor for occupied commercial and institutional buildings near Austin. Send the plans, specs and bid form, or photos and a fixture count for a smaller job. We walk the restrooms, plan which ones close and when, and return one written line-item quote with clarifications and exclusions listed.

Who sends us this work: college and school-district facility and purchasing teams, general contractors with a restroom package, property managers of office and retail buildings, and owners with an accessibility list.

The problem: the building cannot close

A restroom renovation in a campus building, a school or an occupied office cannot shut every restroom at once. People still need a working restroom on each floor, the noisy work has to fit around classes or business hours, and the accessible route has to stay open. The plan for that belongs in the bid, not in a change order.

Scope we cover

Demolition and protection

Remove fixtures, partitions, tile and ceilings, with dust control and protection of the corridors people still use.

Plumbing and fixtures

Rough-in changes, carriers, fixtures and floor drains, performed by the plumbing professionals the work requires.

Tile, flooring and walls

Floor and wall tile, waterproofing where specified, drywall and paint. See commercial flooring.

Partitions and accessories

Toilet partitions, grab bars, mirrors, dispensers and counters as scheduled.

Accessible layouts

Clearances, fixture heights, doors and signage built to the drawings. See ADA corrections.

Lighting, power and ventilation

Lighting, hand-dryer power and exhaust, performed by the trade professionals the work requires.

Accessibility items we build in a restroom renovation

Grab bars

At the water closet, set to the heights and lengths in the drawings.

Clear floor space

Turning clearances inside the room and clear space at each fixture.

Accessible fixtures

Water closet height and centerline, urinal rim height and flush controls.

Lavatories

Knee clearance, pipe protection, and faucets and dispensers within reach.

Partitions

Accessible stall size, door swing and hardware.

Doors and signage

Hardware usable without tight grasping, door clearances and signage on the accessible route.

We build these items to the Texas Accessibility Standards (TAS) and ADA requirements shown in your design documents, and walk the room with you before pricing so existing conditions are on the table. The design and any accessibility review are by the owner's design team.

Working with prime general contractors

When you are the prime on a commercial or public bid, we price the restroom and accessibility scope from your RFQ scope, drawings and addenda and return a bid on your form with clarifications and exclusions in writing. We follow your schedule and phasing plan and route questions through you. See subcontract scopes for general contractors.

Restrooms as one part of a larger renovation across several areas: see commercial renovations for offices and shared spaces.

What to send

Plans and specs, the bid form, the due date and the walk date. For a smaller job: photos, a fixture count per restroom, the building address and when the building is occupied. Read how we bid your finish-out and what to send us. Bid packages can also go through commercial bids.

The process

1. Documents

You send the plans, specs and bid form, or photos and a fixture count.

2. Walk

We walk each restroom and the routes around it, and note what has to stay open.

3. Written line-item quote

One number on your form, with clarifications, exclusions and the phasing we priced.

4. Phase and build

Restrooms close in the agreed order so each floor or wing keeps one in service where the plan allows.

Before you sign: how the bid and changes work

Bidding from a bid package

Send the plans, specs, bid form and due date. We return a written line-item quote on your form with clarifications and exclusions in writing.

Clarifications and exclusions

Anything we are not pricing, such as landlord work or owner-supplied equipment, is listed as an exclusion or as work by others. You see it before you sign, not in the middle of the job.

How change orders work

If the scope changes or we find a hidden condition, the change is written up with its price and agreed in writing before that work starts.

Working in an occupied building

Where the building stays open, we plan the work in phases with you: which areas close, when loud work happens and how people get around the work area.

Permits and inspections

Tell us the permit status: not started, submitted, in review or approved, and who is handling it. We build the schedule around permit review and the inspections the work requires.

Often found once we open it up

Old restrooms hide corroded carriers and drain lines, wet substrate behind tile and floors that do not slope to the drain. Each one is written up before the fix starts. See commercial plumbing and drainage, slab drain-line repair and floor rebuild and commercial bathroom remodels.

Frequently asked questions

Do you renovate restrooms in occupied buildings near Austin?

Yes. Bailey & Bear Construction renovates restrooms in campus, school, office and retail buildings in Austin and nearby cities, about 30 miles around, phased so the building stays open.

Can you bid a restroom package from an RFQ or bid set?

Yes. Send the plans, specs, bid form, due date and walk date. We return a written line-item quote with clarifications and exclusions in writing.

How do you keep restrooms available during the work?

We plan the order with you before work starts, so each floor or wing keeps a restroom in service where the layout allows, and the accessible route stays open.

Do you handle accessibility upgrades?

We build the accessible layout shown in the drawings: clearances, fixture heights, doors, grab bars and signage. The design and any accessibility review are by the owner's design team.

Who performs the plumbing and electrical work?

Plumbing, HVAC and electrical work is performed by the trade professionals the work requires, under Bailey & Bear project coordination.

Can the work happen during summer or break periods?

Yes, where the dates are set in the bid documents. We price the schedule the documents describe and do not promise dates before the site walk.

Related pages

Hub: commercial bids in Austin. Also see commercial bathroom remodels, ADA corrections, institutional facility renovation, how we bid your finish-out and what to send us.

Have a restroom package to price?

Send plans, the bid form and the due date — get a written line-item quote with written clarifications. Mon-Sat 8 AM-6 PM.

You can also send the project form.