How We Bid Your Finish-Out in Austin

Send plans, sq ft and your target date; we tell you if we can hit it.

Call 512-689-8346 Text 512-689-8346

Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.

We bid a finish-out in five steps. You send drawings and the lease work letter, we walk the suite, and you get a written line-item quote that lists landlord work as by others. We then set the schedule with you around permits, long-lead items and landlord work, then build.

The five steps from drawings to build

1. You send drawings and the lease

Drawings or a clear sketch, the lease exhibit or landlord work letter, the suite size and photos of the shell. Drawings still in permit review are fine.

2. We walk the suite

We check the shell against the drawings: slab, walls, ceiling height, the rooftop unit and where power, water and drain lines stub in. We note what the landlord is still delivering.

3. You get a written line-item quote

One price for the tenant-side scope in your drawings. Landlord work is listed as by others, and open questions are written down instead of guessed.

4. We set the schedule together

Permit review, long-lead items such as storefront and lighting, landlord work and inspections set the order. The schedule is built after the walk, not before.

5. We build and keep you posted

One point of contact runs the job. Any change to the scope is written up and agreed before that work starts.

How the bid separates landlord and tenant scope

Tenant scope (ours)

Partitions, ceilings, flooring, paint, doors and hardware, storefront interiors, lighting and power, and tenant-side ductwork and condensate drain, as your drawings show them.

Landlord scope (by others)

Items the lease puts on the landlord, such as the rooftop unit, curb, roof opening and plenum drops, are listed in the bid as by others.

Open items

Anything the lease or drawings leave unclear is flagged in writing before you sign, so no one finds out mid-build who was supposed to do it.

Questions owners and tenants ask

What do you need from me to start a bid?

Drawings or a sketch, the lease exhibit or landlord work letter, the suite address and size, photos of the shell, and your target open date. If something is missing, we tell you what we still need and do not guess.

Why does the bid name landlord work as by others?

Landlord work, such as the rooftop unit, curb, roof opening or plenum drops, is not ours to build or price. Listing it as by others keeps your bid clear about what you are paying us for and what the landlord is delivering.

Is the bid a written line-item quote or time and materials?

The bid is a written line-item quote for the tenant-side scope shown in your drawings. If the scope changes after you sign, the change is written up and agreed before that work starts.

How do you set the schedule?

We build it with you after the site walk. Permit review, whether drawings are approved or still in review, long-lead items such as storefront and lighting, landlord work and inspections all drive it. We do not promise dates before we have walked the suite.

Do you need approved drawings before you can bid?

No. We can bid from drawings that are in review or from a clear sketch, and we mark what is still open. Final pricing depends on the drawings that get approved.

Do you bid spaces outside Austin?

Yes, within about 30 miles of Austin, including Round Rock, Georgetown, Cedar Park, Leander, Pflugerville, Lakeway and Bee Cave.

These answers are general information, not legal or financial advice. Your lease and your landlord work letter control.