Restrooms and ADA upgrades
Fixtures, partitions, accessories, grab bars and clearances rebuilt while the building is closed. See commercial restroom renovation and ADA and accessibility work.
School and campus renovation
Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.
Serving Austin and Central TexasWalkthrough → written scope → line-item estimateSee finished projects
Restrooms, accessibility upgrades, classrooms, doors, ceilings and finishes in school buildings, planned backward from the day students and staff come back.
Bailey & Bear Construction takes summer-break renovation work in public, charter and private school buildings in Austin and nearby cities. Typical scopes are restroom and ADA upgrades, classroom and office refreshes, doors and hardware, acoustical ceilings and finishes. We build the schedule backward from the reopening date, order long-lead items at award, and work for the school directly or as a subcontractor to the prime.
Call or text 512-689-8346 to schedule a walkthrough.
Fixtures, partitions, accessories, grab bars and clearances rebuilt while the building is closed. See commercial restroom renovation and ADA and accessibility work.
Walls, paint, flooring, casework and ceilings in classrooms, front offices and staff rooms, with lighting and data moves coordinated through the trades.
Door, frame and hardware replacement, including accessible hardware and closers. See commercial door installation.
Ceiling grid and tile replacement in classrooms and corridors, sequenced around above-ceiling work. See acoustical ceiling installation.
Classroom casework, counters, trim and built-ins. See commercial finish carpentry.
Lobbies, corridors and shared rooms refreshed in phases so the parts of the building in use over the summer stay open.
School buildings often stay partly in use over the summer for summer programs, administration, custodial crews and maintenance. We follow the school or district access, badging, key and security rules, keep work areas separated from occupied areas, and schedule loud work, shutoffs and tie-ins with the facility team. Rules for who may be on campus are set by the school; we confirm them in writing before mobilizing.
Districts, charter schools and private schools can send us the RFP or ITB directly. When you are the prime on a school renovation, we price the restroom, ADA, door, ceiling and interior scopes from your RFQ scope, drawings and addenda and route questions through you. See subcontractor for general contractors and commercial bids.
Partial packages are fine early in the spring; we can price what is known and list what is missing. The full checklist is in what to send us for a commercial bid.
Send the drawings, scope and schedule window you have. We review the package, walk the space and send a written, line-item scope. Owners and property managers: request a walkthrough. General contractors: submit the bid opportunity.
For renovations in college, city, county and healthcare buildings, see institutional facility renovation in Austin. For owner-funded building upgrades, see capital improvements for commercial property.
As early in the spring as the documents allow. Long-lead items such as doors, frames, hardware, partitions and fixtures need to be ordered at award so they arrive before the building closes. Timing for a specific project is set in the written scope after the walkthrough.
Yes. We separate the work areas from occupied areas, follow the school access and security rules, and schedule loud work, shutoffs and tie-ins with the facility team.
Both. Schools and districts can send the RFP or ITB directly, and primes can send the RFQ scope, drawings and addenda for a sub quote.
Austin and nearby cities within about 30 miles. Call with the campus address to confirm.
Send the bid documents through the contact page, or call or text 512-689-8346 to schedule a walkthrough.