Skip to main content

Luxury home remodeling in Austin

Luxury Remodel Contractor in Austin

Bailey & Bear plans substantial whole-home and multi-room Austin renovations around defined structural scope, premium selections, written assumptions and exclusions, and documented change handling. Kitchen, bath, exterior, and building-system work can be coordinated when the home requires a broader design-led scope.

Bailey & Bear Construction plans luxury whole-home and multi-room remodels in Austin. The published Austin market range for high-end whole-home work is $100 to $300+ per square foot, commonly $150,000 to $500,000+. Structural scope and specification level decide where a house lands, and each remodel is quoted after reviewing the house and the selections.

Whole-home and multi-room focus  ·  Design and selection readiness  ·  Scope clarity before work begins

Luxury remodel quick answers

What does a luxury remodel include?

High-end kitchen, bath, whole-home, and finish-update scope planning, plus structural, framing, roofing, siding, windows, drainage, and exterior-repair coordination when a whole-home scope requires it.

What changes a luxury remodel budget most?

Moving the floor plan, especially a load-bearing wall, is the largest single step change. On a whole-home scope, cabinetry is usually the biggest line after structure.

How are changes handled after work starts?

Every change is priced in writing, with its schedule impact, before it is built. Nothing gets agreed verbally and invoiced later.

Which Austin neighborhoods does this cover?

High-end remodels across Westlake, Tarrytown, Lake Austin, Barton Creek, Rollingwood, and Pemberton Heights.

Design-led renovation with scope clarity

Who This Is For

Serious Austin homeowners, architects, designers, and owner representatives planning a substantial whole-home or multi-room renovation.

Ideal Fit

  • A defined renovation scope and reliable property access
  • Design direction, drawings, or selections ready for review
  • High-end finish expectations with a realistic planning range and schedule

Our work

Our project gallery, process transparency, and scope discipline give Austin owners a clearer way to compare remodel partners without fake testimonials.

The real variable

What separates a $150,000 remodel from a $450,000 one is rarely the square footage

Two Austin houses of the same size, with the same rooms opened up, can land at opposite ends of the published $150,000 to $500,000+ range. The footprint is almost never the reason. Specification level and structural scope are — and both are decided by the owner, in a handful of choices made before anyone orders material.

This is also why no honest builder can hand you a per-square-foot number over the phone. The market range exists; where your project sits inside it is a function of the six decisions below.

The decisionWhat it actually changes
Does the floor plan move?Leaving walls where they are keeps a remodel in the finish trades. Moving a load-bearing wall pulls in beams, posts, support for the new load path, usually an engineer’s drawings, and a different permit path. It is the largest single step change in the whole budget. See load-bearing wall removal.
CabinetryStock and semi-custom cabinetry is bought in standard sizes and made to fit with fillers. Shop-built custom is drawn for your room, takes the real ceiling height, and costs a multiple of the same linear footage. On a whole-home scope it is usually the biggest line after structure.
Stone and tileTile is priced by the box. Slab is priced by the slab, then by the fabricator’s labor on top of it, and a book-matched or waterfall install is mostly that labor. Large formats, mitered edges and pattern layouts all add setting hours to identical square footage.
Windows and exterior doorsReusing the existing openings is one job. Changing sizes means header work, framing, exterior repair, and new trim or siding around every opening that moved. Clad-wood and steel units also carry the longest lead times on the project, which makes them a schedule decision as much as a cost one.
Plumbing and lighting fixturesAcross a whole house, the spread between a builder-grade package and a specified designer package runs into tens of thousands of dollars, and almost none of it shows up in the labor. It is the fastest line to move in either direction once you know where you stand.
How much of the house you openOpening ceilings, exterior walls or the floor system exposes systems that were never in the plan — see the era table below. Opening less is cheaper and less certain. Opening more costs money now and removes unknowns later.

Every figure on this page is an Austin market range for high-end work, not a Bailey & Bear rate card. We quote each remodel after reviewing the house and the selections.

Reading the number

A remodel budget is five buckets, and a per-square-foot number usually contains only one

When two proposals land far apart, the gap is often not the work. It is that the two numbers are describing different things. Before comparing anything, separate the project into the five buckets it is actually made of.

  • ConstructionThe labor and materials the general contractor carries: demolition, structure, the trades, drywall, install, finish carpentry, paint. This is the bucket most people mean when they say “the bid.”
  • SelectionsEverything you choose and we install — cabinetry, tile, stone, plumbing and lighting fixtures, appliances, hardware, flooring. It is the largest swing in the project and typically the least defined at signing.
  • Design and engineeringArchitect or designer fees, a structural engineer wherever the plan moves, a survey where the exterior changes. On a whole-home scope this is real money, and it is spent before construction begins.
  • Permits, fees and utility workCity review and permit fees, plus any service, meter or drainage work the scope triggers. Ask whether a quoted number includes them or excludes them. Both are legitimate; the difference is not small.
  • ContingencyWhat you hold back for whatever the house reveals once it is open. It belongs in your number, not inside the builder’s price. A contractor who buries contingency in the bid looks expensive next to one who does not, and the one who does not will be back asking for it.

An allowance is not a price

The most useful question you can ask about a remodel contract is how many of its lines are allowances. An allowance is a placeholder: a dollar figure held for a selection nobody has made yet. A specified selection is a real product with a real price attached. Both sit in the same column of the same proposal, and only one of them is actually known.

A contract that is mostly allowances is not a fixed price. It is an estimate with a signature on it. The fix is not to eliminate allowances, because early in a project some are unavoidable, but to convert the biggest ones into specified selections before demolition — starting with cabinetry, appliances, tile and stone, and windows. Those four settle most of the distance between $150,000 and $500,000, and every one of them has a lead time that punishes a late decision.

Why the first two weeks move the number

What opening the walls tends to find in an Austin house

Austin’s housing stock is not one thing, and the era a house was built in predicts most of what a remodel finds behind the drywall. None of it is a defect; it is what was normal practice at the time. It matters because it is the most common reason a budget moves, and because nearly all of it surfaces in the first two weeks after demolition.

When it was builtCommonly foundWhat it does to the scope
Pre-1950 central Austin
Tarrytown, Pemberton Heights, Clarksville, Travis Heights
Pier-and-beam floors, little or no insulation in the exterior walls, original galvanized supply and cast-iron drain lines, early cloth-sheathed or knob-and-tube wiring, and floor framing that later trades have cut through.The finish scope you wanted arrives attached to a systems scope you did not plan for. The upside is access: a crawlspace makes replacing supply and drain lines far less invasive than the same work over a slab.
1950s–1970s ranch
Allandale, Crestview, Rollingwood, older Westlake
Slab-on-grade construction, cast-iron drain lines cast into or under that slab, an undersized electrical service, ductwork run through an unconditioned attic, and in some mid-1970s houses aluminum branch wiring.Anything under the slab is the expensive unknown, because reaching it means cutting concrete. Relocating a kitchen or a bathroom in one of these houses is a plumbing decision before it is a design one.
1980s–2000s custom
Westlake, Barton Creek, Lake Austin, Steiner Ranch
Large volumes and complex rooflines, first-generation zoned HVAC now at the end of its service life, and in some late-1980s to mid-1990s houses polybutylene supply piping.Fewer surprises inside the walls, more scope in the exterior envelope and the mechanical systems. Hillside sites add access difficulty, drainage and retaining work that a flat lot never raises.

Two Austin-specific notes cut across all three. East and central Austin sit largely on expansive clay soils that move with moisture, so foundation behavior and drainage are part of any serious remodel conversation here; west of MoPac the ground is largely limestone, which trades soil movement for the cost of cutting into rock. And the older the house, the more likely it is that a previous remodel — not the original builder — is what you are really working around.

These are patterns, not diagnoses. The point of publishing them is not to predict your house. It is to explain why a contingency line exists at all, and why an assessment has to come before a price. Where a previous builder has already closed the walls up and left, the unknowns are larger again: see what to do when a contractor abandons an Austin remodel.

Sequence

The decisions that have to be locked before demolition, and what each one holds up

Remodels rarely go over budget in one large event. They go over in a series of small, late decisions, each costing a multiple of what the same decision would have cost earlier. The order below is the order the job needs them in, which is not the order they are enjoyable to make.

DecideBecause it holds up
The floor plan and any structural changeEverything. Beams, posts, support for the new load path, the drawings, the permit route and the schedule all descend from it. A plan change after framing is the most expensive change order on a residential job.
Windows and exterior doorsFraming. Openings are built to the unit, not the other way round, and clad-wood and steel units carry the longest lead times in the project.
AppliancesCabinetry, electrical and plumbing. A cabinet shop draws to the exact appliance, so a range or refrigerator swapped late means new shop drawings and sometimes new rough-in. Appliances are a framing decision wearing the disguise of a shopping decision.
CabinetryCountertop templating and the whole finish schedule behind it. Custom cabinetry is built to order and cannot be accelerated by paying more once the shop is loaded.
Plumbing fixtures and valve trimTile. Valve bodies are set in the wall before waterproofing and tile go on. Changing a shower valve after tile is a demolition, not a swap.
Tile and stone layoutWaterproofing, substrate and setting hours. Layout drives labor as much as the material does, and it gets settled on paper before a setter is standing in the room.
The lighting and electrical planDrywall. Walking the rough-in with the walls still open is the last cheap moment to move a switch, add a circuit or shift a can. After drywall and paint the same change is three trades.

How changes get handled once work has started

Some changes are unavoidable. The house reveals something, or you see a space framed and want it different. What separates a controlled project from a runaway one is not whether changes happen, but whether each one is priced in writing, with its schedule impact, before it is built. Verbal changes are where the relationship goes wrong, because both parties remember them differently and only one of them is holding the invoice.

Planning the calendar rather than the cost? How long a home remodel takes in Austin covers the three clocks — design and selections, City of Austin permit review, and construction — against real project schedules. Whether your scope needs a permit at all is covered on permits for an Austin remodel, and the question most whole-home clients underestimate is answered on living in the house during a remodel.

Where this page hands off

A luxury remodel is rarely one page’s worth of decisions. Focused on a single room: kitchen remodel Austin, bathroom remodel Austin. Planning a full renovation: whole-home renovation. Still deciding whether we are the right firm at all: what to ask a general contractor in Austin, plus high-end general contractor. Rebuilding after water, fire or storm damage: water damage repair and rebuild. By neighborhood: Westlake, Barton Creek, Lake Austin, Travis Heights.

About the author

Matthew Calderon, Owner, Bailey & Bear. Matthew personally runs every Bailey & Bear project in Austin, from luxury home remodels to after-hours commercial cleaning for rooms like Uchi, Loro and Brazos Hall. One accountable owner start to finish, fixed pricing in writing before demolition, photographic documentation throughout. Owner-operated in Austin, TX, rated 5.0 across 58 Google reviews on the construction side and 5.0 across 7 on the cleaning side. Reach him at 512-689-8346.

Who this helps

Owners planning a whole-home or multi-room renovation who want the scope, the exclusions and the money settled on paper before demolition, rather than discovered during it. Also owners' reps and designers who need a builder that will price a drawing set honestly instead of bidding low and recovering it in change orders.

Process transparency

We walk the house, read whatever drawings exist, and write down three things: what is included, what is explicitly excluded, and what is still an allowance rather than a price. Every change after that is priced in writing, with its schedule impact, before it is built. Nothing gets agreed verbally and invoiced later.

Recent work

The Bailey & Bear project gallery gives homeowners visual context for finish quality, scope complexity, and completed work.

Why choose Bailey & Bear for this Austin remodel?

One accountable owner from the first walkthrough to the final walk, a fixed price in writing before demolition, and photographic documentation throughout. For documented remodel scope and finished work, see the Fiorellino full-home remodel. 5.0 across 58 Google reviews.

Project types this page fits

  • Whole-home or multi-room Austin remodels where sequencing, access, finish levels, and owner communication need early planning.
  • High-end kitchen, bath, and living-space renovations where drawings, finish expectations, and exclusions should be clarified before pricing.
  • Luxury remodel plans where timeline windows, trade coordination, cleanup standards, and change-order expectations need to be visible up front.

Before we start

Five things belong on paper before anyone swings a hammer: the scope and its written exclusions, license and insurance documentation, the warranty terms, who is responsible for cleanup and debris removal, and the timeline window with what happens if it slips. If a builder will not put those in writing at contract, that is the answer to the question you were asking.

Who should request this?

Best fit: Austin homeowners and owners reps planning high-end renovations, whole-home remodels, kitchen/bath combinations, or finish-sensitive work.

What happens after you reach out?

After you send rooms involved, photos, finish goals, timeline, and constraints, Bailey & Bear can shape the next walkthrough or scope discussion.

Fiorellino — full remodel

A modern Austin home that kept its original charm: new hardwood floors, updated kitchen and baths, and a herringbone kitchen backsplash. (2022)

What clients say

Rated 5.0 across 58 Google reviews. “Detail oriented and gets the job done.” — Nathan R.

Ready to define the high-end remodel scope?

Send rooms involved, photos, finish goals, drawings if available, timing constraints, and budget guardrails so Bailey & Bear can see the project path clearly. No obligation; send the basics and expect a clear next-step reply.

Schedule a luxury remodel consult

Move the home remodel from idea to scope

If the project includes kitchen, bathroom, exterior, or commercial-style finish work, include those links in the request so the scope stays in one place.

Start the luxury remodel request

Bailey & Bear is a high-end general contractor in Austin for the full project.

★★★★★

"Matt did a great job on my interior remodeling — detail oriented and gets the job done."

— Nathan R., verified Google review · 5.0★ from 58 reviews

Serving Austin-area neighborhoods including Westlake, Lakeway, Steiner Ranch, and Dripping Springs.

Luxury & whole-home remodel FAQ

What is a luxury home remodel?

A luxury remodel is a high-end renovation with premium materials, custom finishes, and detailed craftsmanship. Bailey & Bear handles kitchens, bathrooms, additions, and whole-home projects. Each scope is tailored to the home.

How much does a luxury remodel cost in Austin?

The cost depends on the size of the project, the materials, custom work, and finishes. As an Austin market range, high-end whole-home work runs $100 to $300+ per square foot, commonly landing between $150,000 and $500,000+. Luxury scopes sit at the upper end of that. It is a range, not a quote. Bailey & Bear quotes each remodel after reviewing the house and the selections.

Why can you not give me a price per square foot over the phone?

Because the published Austin range for high-end work, $100 to $300+ per square foot, is three times as wide at the top as at the bottom, and where a project lands inside it is decided by whether the floor plan moves, how much of the house gets opened up, and the specification level of the cabinetry, stone, windows and fixtures. A per-square-foot number quoted before those are known is a guess wearing the clothes of a quote.

What is the difference between an allowance and a fixed price?

An allowance is a placeholder held for a selection nobody has made yet. A specified selection is a real product with a real price attached. Both appear in the same column of the same proposal, and only one of them is actually known. A contract that is mostly allowances is an estimate with a signature on it, which is why the highest-dollar allowances — cabinetry, appliances, tile and stone, and windows — should be converted into specified selections before demolition starts.

How much should I hold back for the unexpected?

Enough that finding something does not stop the job. There is no single percentage that is honest across every house: a pre-1950 pier-and-beam home in Tarrytown with its original supply lines carries far more unknown than a 2005 build, and a scope that opens ceilings, exterior walls or the floor system will surface more than one that stays in the finish trades. Hold that money in your own budget rather than expecting it to be hiding inside the contract price.

Do I need an architect or an engineer for a whole-home remodel in Austin?

It depends on whether the structure changes. Work that stays in the finish trades often needs neither. Moving or removing load-bearing walls, changing the roof, adding square footage or altering the foundation generally calls for drawings, usually a structural engineer, and a City of Austin permit review. We tell you which side of that line your scope falls on before you spend money on design.

Which changes cost the most to make late?

In order: the floor plan, then anything a later trade has already covered up. Moving a wall after framing pulls in structure, drawings and often the permit. A shower valve changed after tile is a demolition rather than a swap. A cabinet change after the shop has drawn to your appliances means new shop drawings. The same decisions made before demolition cost a fraction of that, which is why we push selections earlier than most clients expect.

What areas do you serve?

Bailey & Bear serves Austin plus Westlake, Tarrytown, Rollingwood, Barton Creek, Pemberton Heights, Steiner Ranch, and Lakeway. Call 512-689-8346 to confirm your area.

What proof supports your work?

Bailey & Bear Construction holds a 5.0 rating from 58 Google reviews and is a family-owned Austin general contractor. Its project pages show completed work across the area.

Is Bailey & Bear a fit for whole-home renovations in Austin?

Yes. Whole-home renovations in Austin require phased sequencing, trade coordination, budget clarity, and steady communication across many rooms and finishes. Bailey & Bear manages that complexity with tight scope control so the project stays organized from planning through final walkthrough.

Can Bailey & Bear handle six-figure and $100,000-plus remodels?

Yes. Larger remodels demand more than craftsmanship — they take planning, trade coordination, budget clarity, and schedule control. Bailey & Bear is built for high-scope Austin residential and commercial work where the details, communication, and finish level matter.

What matters most on a million-dollar renovation project?

On a million-dollar renovation, the biggest factors are scope clarity, sequencing, finish consistency, communication, and decision control. Large projects move best when the contractor manages complexity without losing visibility on quality, timing, and owner expectations.

Can a whole-home renovation include rebuild after a loss?

Yes. A whole-home renovation can include structural and finish repairs, and Bailey & Bear also rebuilds after water, fire, or storm damage, coordinating the restoration scope alongside the remodel.

How much does a high-end kitchen remodel cost in Austin?

Most Austin kitchen remodels land between $30,000 and $70,000, with a lighter refresh starting near $15,000. High-end kitchens with custom cabinetry, premium stone, and structural changes commonly run $70,000 to $150,000+. Bailey & Bear has completed 27 Austin kitchens, and every quote is built from the actual room, selections, and scope.

How much does a high-end bathroom remodel cost in Austin?

Austin bathroom remodels typically run $18,000 to $40,000, with a refresh starting near $8,000. Full-gut luxury baths with moved plumbing, curbless showers, and premium finishes commonly run $40,000 to $90,000+. Bailey & Bear has completed 52 Austin bathrooms, and each quote follows a walkthrough of the space.

Should I remodel my kitchen and bathrooms separately or as one whole-home project?

Separate projects let you spread the budget over time; a single whole-home remodel is more efficient once, with one schedule, one crew sequence, and finishes decided together. If your kitchen and bath scopes are both high-end, see how they combine on our luxury home remodel overview.