Paint and wall repair
Patch, prep and paint offices, corridors and common areas. See commercial painting.
Office refresh ยท Austin TX
Send photos, a floor plan and the suite address — get a written line-item quote.
Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.
Bailey & Bear Construction refreshes occupied offices in Austin, Round Rock, Cedar Park, Georgetown and Pflugerville: paint, flooring, ceilings and lighting, phased so your staff keep working. Send photos and a floor plan. We walk the suite and return one written line-item quote that shows the phasing, with after-hours work priced as an option.
Occupied office renovation in Austin: office renovation and office remodel for owners, tenants and property teams across the Austin area. Call or text 512-689-8346 or send plans for a bid.
Pick the page closest to your space.
Four steps, in this order.
Send what you have and note anything that is missing.
Call or text Bailey & Bear Construction at 512-689-8346, or send plans or a scope through the contact page. We bid this work in Austin and nearby cities.
Send: plans or drawings, or a written scope if there are none; address, suite number and who to send the bid to; photos of the space and the bid due date; existing floor plan and finish schedule; access limits for after-hours or phased work; furniture and IT vendor dates that touch the schedule. A partial set is fine; note anything that is missing.
Bailey & Bear Construction works in Austin and nearby cities including Round Rock, Cedar Park, Georgetown, Pflugerville, Lakeway, Bee Cave, Kyle and Buda.
It depends on the scope, the building and the finish level, so this page does not give a number. Send plans or a scope and ask for a written bid.
Work can be phased around occupancy when the plan allows it. Send access limits and any after-hours rules with the plans.
Bailey & Bear is an office refresh contractor for tenants, owners and property managers near Austin whose space stays in use during the work. We repaint, replace flooring, ceilings and lighting, and rework a few walls or doors, one area at a time. The bid lists each area, the order of work and what moving furniture involves.
Who calls us: office tenants at a lease renewal, property managers refreshing a suite or common area, and owners getting a building ready for the next tenant.
A refresh is lighter than a build-out, but people are at their desks. Furniture has to move twice, flooring and paint have odors and cure times, and ceilings come down over working computers. The order of work is most of the job.
A refresh keeps the layout and renews the surfaces: paint, flooring, ceiling tile, lighting, and small fixes to doors, millwork and break rooms. A tenant improvement changes the space itself: new walls and rooms, new plumbing, reworked HVAC and power, usually from permit drawings.
If your list is mostly finishes, this page is the right one. If you are moving walls across the suite or changing the use of the space, see commercial finish-outs and tenant improvements or office build-outs. Many jobs are a mix; the bid separates the refresh items from the construction items so you can decide on each.
Patch, prep and paint offices, corridors and common areas. See commercial painting.
Carpet tile, plank and base replaced one zone at a time. See commercial flooring.
Replace stained or damaged grid and tile. See acoustical ceilings.
Fixture replacement and LED upgrades, performed by the electrical professionals the work requires.
Add or remove a few walls, doors or glass fronts. See commercial drywall and framing.
Counters, cabinets, fixtures and finishes. See commercial restroom renovation.
These are planned with you at the walk and written into the bid, so the plan is agreed before work starts.
The suite is split into zones. One zone is closed at a time, and the bid says how staff get to exits, restrooms and the break room while it is closed.
The bid says who moves what, and what is covered in place. Computers, phones and systems furniture are usually handled by your team or vendor.
Sanding, demolition and other loud or dusty tasks are grouped and scheduled with you, with the work area closed off from the areas in use.
Paint, adhesive and flooring need time before a room is back in use. The schedule shows when each zone can be reoccupied.
Each zone is cleaned of construction debris and dust from our work before it is handed back.
Electrical, HVAC and plumbing work is performed by the trade professionals the work requires and scheduled inside the same zone plan.
Send what you have; partial information is fine. The suite address and city, the approximate size, photos of each area, a floor plan or sketch, the list of what you want refreshed, when the space is occupied and which areas cannot close, the building rules on work hours, elevators and loading, and the timing you are aiming for. Read how we bid your finish-out and what to send us.
You send photos, a plan and the building rules.
We walk the suite with you and agree the zones and the order.
One written price by area, with after-hours work shown as an option.
One zone at a time, with furniture moved and put back as the bid describes.
One written price for the scope in your drawings or photos. Open questions are written down as clarifications instead of guessed, so you can compare bids line by line.
Anything we are not pricing, such as landlord work or owner-supplied equipment, is listed as an exclusion or as work by others. You see it before you sign, not in the middle of the job.
If the scope changes or we find a hidden condition, the change is written up with its price and agreed in writing before that work starts.
Where the building stays open, we plan the work in phases with you: which areas close, when loud work happens and how people get around the work area.
Night or weekend work is an option, not a default. Where the scope and the building allow it, it is priced as a separate line and agreed in writing before it is scheduled.
Send the property manager contact and the building rules. Work the landlord has to approve or perform is listed in the bid.
Pulling old carpet and ceiling tile shows what was under it: adhesive and floor prep that the new flooring needs, stained tile from an old leak and wiring that has to be tidied before a ceiling goes back. See ceiling repair after a roof leak, commercial electrical work and ADA corrections.
Yes. Bailey & Bear Construction refreshes occupied offices in Austin and nearby cities, about 30 miles around, one zone at a time so staff keep working.
Usually paint, flooring, ceiling tile and lighting, plus small changes such as a wall, a door or a break-room update. The bid lists each area.
A refresh renews finishes and keeps the layout. A tenant improvement changes walls, plumbing, HVAC or power, usually from permit drawings. If your job is a mix, the bid separates the two.
It can be priced that way where the scope and the building rules allow it. After-hours work is shown as a separate option in the bid and agreed in writing before it is scheduled.
As a written line-item quote by area after we walk the suite. Changes are written up and agreed before that work starts.
It depends on the scope and the city. Finish work is different from moving walls or changing electrical. We flag at the walk which items may need a permit; the permitting authority decides.
The bid says who moves what. We can move standard furniture within the suite; computers, phones and systems furniture are usually handled by your team or vendor.
Electrical, HVAC and plumbing work is performed by the trade professionals the work requires, under Bailey & Bear project coordination.
Hub: commercial finish-outs in Austin. Have a bid package? Send your ITB, RFQ or plan set. Also see office build-outs, office lobby and common-area renovation, commercial renovation, commercial restroom renovation, how we bid your finish-out and what to send us.
Refreshing more than one suite, floor or shared area? See commercial renovations for offices and shared spaces for how several work areas are scoped, sequenced and handed back.
Send photos, a floor plan and the suite address — get a written line-item quote. Mon-Sat 8 AM-6 PM.
You can also send the project form.
Use the contact page, or call or text 512-689-8346.