Classrooms and corridors
Walls, ceilings, doors, flooring and finishes repeated across many classrooms. See commercial drywall and acoustical ceilings.
Private schools, charter campuses and learning centers
Have a deadline? Call or text 512.689.8346 with the address, square footage and date. We'll tell you on that call whether we can make your date.
Serving Austin and Central TexasWalkthrough → written scope → line-item estimateSee finished projects
Classrooms, labs, gyms, cafeterias and offices built or converted for private, charter and learning-center campuses in Austin and nearby cities, on the calendar the school sets.
Private school build out contractor in Austin: classrooms, labs, gyms and offices for private and charter campuses. Call or text 512-689-8346 or send plans for a bid.
Pick the page closest to your space.
Four steps, in this order.
Bailey & Bear Construction builds out private and charter school campuses in Austin and nearby cities, including conversions of office, retail and church buildings. Send the building, the campus plan and the date classes start. We walk the property, price classrooms, labs, shared spaces and offices on separate lines, and phase the work so the campus can open on the school calendar.
Call or text 512-689-8346 to schedule a walkthrough. For child care and early learning, see child care center build out. For church campuses used as schools, see church renovation, and for conversions, see change of use build out.
Walls, ceilings, doors, flooring and finishes repeated across many classrooms. See commercial drywall and acoustical ceilings.
Rooms with sinks, casework and ventilation built to the equipment and curriculum plan. See commercial plumbing.
Larger rooms with finishes and kitchens for the use. See commercial kitchen remodel and commercial flooring.
Front office, secure entry and administrative rooms. See office build out.
Restroom groups and routes for students and staff. See commercial restroom renovation and ADA compliance.
Renovations scheduled inside the school calendar. See school summer renovation.
The first day of class is a date families have planned around. The schedule is built backward from the first day of class, with the rooms needed on day one finished first and later phases, such as a gym or lab, sequenced after. Send the calendar and which rooms are required to open, and the bid will show what is done by when.
Many private and charter schools start in an office, retail or church building. Conversions often change the occupancy, which affects exits, restrooms, fire items and the permit path. We walk the building and list what the conversion triggers as separate lines. See commercial build out permits.
Some schools open one building or wing while another is still under construction. The plan separates the occupied area from the work area, with its own entry, exits and protected paths. See school summer renovation for work done inside a break.
Partial packages are fine early; we can price what is known and list what is missing. The full checklist is in what to send us for a commercial bid.
Call or text Bailey & Bear Construction at 512-689-8346, or send plans or a scope through the contact page. We bid this work in Austin and nearby cities.
Send the drawings or a written scope, the schedule that matters, occupancy and access limits, finish standards and the approval contact. A partial set is fine; note anything that is missing.
Bailey & Bear Construction works in Austin and nearby cities including Round Rock, Cedar Park, Georgetown, Pflugerville, Lakeway, Bee Cave, Kyle and Buda.
Yes. Send the building and the plan. A conversion usually changes the occupancy, so the bid lists the exits, restrooms and permit items it triggers.
Yes. Send the order you need. The plan keeps the occupied area separate from the work area.
It depends on the scope, the building and the finish level, so this page does not give a number. Send plans or a scope and ask for a written bid.
If your school is leasing a former retail space, read about retail buildouts in Austin.
For work inside a summer break, see school summer renovation in Austin. For public and civic buildings, see institutional facility renovation.
Send the drawings, scope and schedule you have. We walk the space and send a written, line-item scope. Owners and property managers: request a walkthrough. General contractors: submit the bid opportunity.